Click here to see important news regarding the aCar App

Tundra Note Log

2012 Toyota Tundra
Property of apexcutoms79. Added Oct 3 2015

Showing all notes


May 12 2021

Bathroom Install soap and shampoo niche tile. Install tub legs tile. 4 hrs

  • 195,686

Added by apexcutoms79 on May 12 2021 at 9:22 pm


Apr 23 2021

Bathroom Install 5 rows of tile 4.5 hrs

  • 194,309

Added by apexcutoms79 on Apr 23 2021 at 8:28 pm


Apr 21 2021

Bathroom Seal top of backsplash Install 4 rows of tile 4 hrs

  • 194,134

Added by apexcutoms79 on Apr 21 2021 at 4:27 pm


Apr 19 2021

Bathroom Install vanity backsplash and vanity plumbing trim out. 5.5 hrs

  • 194,006

Added by apexcutoms79 on Apr 19 2021 at 3:42 pm


Apr 15 2021

Bathroom Install countertops 2 hrs

  • 193,684

Added by apexcutoms79 on Apr 15 2021 at 6:21 pm


Apr 13 2021

Bathroom Level up counters. Install tile on the east shower wall. 7 hrs

  • 193,473

Added by apexcutoms79 on Apr 13 2021 at 8:45 am


Apr 3 2021

Bathroom

  • 192,998

Added by apexcutoms79 on Apr 3 2021 at 9:34 am


Apr 2 2021

Bathroom Work on cabinets and take countertops and other cabinet downstairs. 4 hrs

  • 192,902

Added by apexcutoms79 on Apr 2 2021 at 7:01 pm


Mar 20 2021

Bathroom Caulked trim to case and base to wall. Siliconed tub to floor. 6 hrs

  • 191,477

Added by apexcutoms79 on Mar 20 2021 at 10:40 am


Mar 17 2021

Bathroom Install baseboard 3 hrs

  • 191,359

Added by apexcutoms79 on Mar 17 2021 at 8:40 pm


Mar 13 2021

Bathroom Install casing and pick up more trim 5.5 hrs

  • 191,049

Added by apexcutoms79 on Mar 15 2021 at 1:58 pm


Mar 12 2021

Bathroom Pick up casing material Start casing doors. 3 hrs

  • 190,894

Added by apexcutoms79 on Mar 12 2021 at 8:20 am


Mar 5 2021

Bathroom Installed the rest of the flooring Layed tile on the north wall 13 hrs

  • 190,655

Added by apexcutoms79 on Mar 5 2021 at 8:19 am


Mar 4 2021

Bathroom Layout and lay first and second rows of tile, let set up to install the rest tomorrow. Rent laminate cutter and started installation of the flooring. 9 hrs

  • 190,540

Added by apexcutoms79 on Mar 4 2021 at 7:21 pm


Feb 27 2021

Bathroom Install medicine cabinets Install door hardware and bumpers Cut schluter trim Cleaned out garbage Scraped tub room floor 6 hrs

  • 190,369

Added by apexcutoms79 on Feb 27 2021 at 10:33 am


Feb 26 2021

Bathroom Sealed tub Clean up 4 hrs

  • 190,248

Added by apexcutoms79 on Feb 26 2021 at 10:42 am


Feb 25 2021

Bathroom Finish electrical trim out Move medicine cabinets to basement 3.5 hrs

  • 190,141

Added by apexcutoms79 on Feb 25 2021 at 5:07 pm


Feb 24 2021

Bathroom Electrical trim out 4 hrs

  • 190,043

Added by apexcutoms79 on Feb 24 2021 at 5:29 pm


Feb 20 2021

Bathroom Installed RedGard Ground down floor hump Bought new vacuum Put longer screws in door hinges Cleaned everything out for paint. 7 hrs

  • 189,771

Added by apexcutoms79 on Feb 20 2021 at 8:52 am


Feb 19 2021

Bathroom Install WC door. Start putting hardiebacker on. Finish texture 12 hrs

  • 189,652

Added by apexcutoms79 on Feb 19 2021 at 8:49 am


Feb 13 2021

Bathroom Repair cracks and install doors 8 hrs

  • 189,533

Added by apexcutoms79 on Feb 13 2021 at 10:39 am


Jan 28 2021

Bathroom Sanded main room 4 hrs

Added by apexcutoms79 on Jan 28 2021 at 9:02 pm


Jan 27 2021

Bathroom Finish applying 1st coat and install electrical outlet boxes. 2.5 hrs

Added by apexcutoms79 on Jan 27 2021 at 7:49 pm


Jan 23 2021

Bathroom Tape and mud screws and joints. 5 hrs

  • 188,600

Added by apexcutoms79 on Jan 23 2021 at 4:15 pm


Jan 18 2021

Bathroom Mud and tape 9 hrs

  • 188,450

Added by apexcutoms79 on Jan 18 2021 at 11:10 am


Jan 8 2021

Bathroom Installed insulation in East wall and ceiling. 7 hrs

  • 187,714

Added by apexcutoms79 on Jan 8 2021 at 9:35 am


Jan 2 2021

Bathroom Finished plumbing rough in. 9 hrs

  • 187,548

Added by apexcutoms79 on Jan 2 2021 at 10:06 am


Dec 31 2020

Bathroom Finish rough-in plumbing. Picked up water supply ball valves and misc parts. 9 hrs

  • 187,293

Added by apexcutoms79 on Dec 31 2020 at 9:33 am


Dec 30 2020

Bathroom Plumbing rough-in 8 hrs

  • 187,182

Added by apexcutoms79 on Dec 30 2020 at 10:02 am


Dec 26 2020

Bathroom Drill rest of plumbing rough-in holes. Run hot & cold lines to the tub. Run 2” pipe for left waste line and waste vent. 8.5 hrs

  • 187,050

Added by apexcutoms79 on Dec 26 2020 at 9:32 am


[Back to Vehicle Profile]

Tips

fuel additives

use a fuel additive. i use lucas fuel treatment and have no... ...

by joedonbob

Read more tips